Free Quotes
Within 48 Hours

Trusted By

Avoid costly mistakes with professional demolition and excavation tailored to your needs

Are you looking for safe and efficient demolition and excavation services in Shellharbour?

Tearing down a structure or preparing land for a new project isn’t just about heavy machinery—it’s about precision, safety, and minimising risks.

Without the right expertise, you could face costly delays, unexpected hazards, and regulatory headaches.

At DemoEx, we take the stress out of the process of demolition and excavation in Shellharbour. Our skilled team ensures every project is completed safely, efficiently, and in full compliance with local regulations so you can focus on what comes next.

The DemoEx Difference:

  • 100% free quotes with zero obligation or commitment
  • Certified asbestos removal experts dedicated to compliance
  • 25+ years of experience in demolishing projects, building and construction
  • Fast and reliable service with affordable pricing and expert advice

With years of industry experience, we specialise in residential, commercial, and industrial projects of all sizes.

Our professionals are fully licensed, equipped with the latest technology, and committed to delivering exceptional results with minimal disruption to your property and surroundings.

Let’s make your project hassle-free. Contact DemoEx today at 0417 233 700 or claim your fast and FREE quote online.

Our expertise

When planning a project in Shellharbour, it’s essential to choose the right method for your needs. The available options depend on factors such as project size, site conditions, and local regulations. Here are the key options:

Residential Projects

If you’re removing an old home or structure to make way for a new build, residential demolition is the best option. This process can include fully or partially demolishing a house, and safe asbestos removal if required.

Commercial and Industrial Projects

For larger structures such as warehouses, office buildings, and industrial sites, commercial projects requires specialised equipment and strict compliance with safety and environmental laws.

Excavation and Site Preparation

Excavation services include land clearing, trenching, and earthmoving to prepare a site for construction. Whether it’s digging foundations, levelling land, or creating drainage systems, proper excavation ensures stability for future developments.

Selective and Interior Demolition

Not all projects require tearing down an entire structure. Selective demolition allows for the removal of specific sections while preserving the integrity of the remaining building. This is ideal for renovations, extensions, or upgrades.

Controlled and Mechanical Demolition

For precise and safe removal of structures, this technique uses heavy machinery such as excavators, bulldozers, and wrecking balls.

Controlled demolition involves carefully planned techniques, often using advanced equipment to minimise impact on surrounding areas.

Environmental and Sustainable Demolition

For eco-conscious projects, sustainable methods focus on recycling materials, reducing landfill waste, and minimising environmental impact.

demolition and excavation Shellharbour

How much do demolition and excavation services cost in Shellharbour?

The cost of these services in Shellharbour varies depending on several factors, including the project size, site conditions, and specific requirements. Below is a general cost breakdown to help you estimate your budget.

Residential Project Costs

  • Full house demolition (single-storey home): $15,000 – $30,000
  • Double-storey home demolition: $20,000 – $40,000
  • Partial demolition (e.g., interior walls, extensions): $5,000 – $15,000
  • Asbestos removal (if required): Additional $3,000 – $10,000, depending on the extent

Commercial and Industrial Project Costs

  • Small commercial buildings: $30,000 – $80,000
  • Large industrial sites: $100,000+ (varies based on complexity and hazardous materials)

Excavation Costs

  • Basic land clearing: $2,000 – $10,000
  • Site preparation and foundation digging: $5,000 – $20,000
  • Trenching (for plumbing, electrical, or drainage): $50 – $200 per metre
  • Rock excavation (if heavy-duty machinery is needed): Additional $5,000 – $20,000

Factors That Affect Cost

  • Size and complexity – Larger and more complex projects require more time and specialised equipment.
  • Site accessibility – Difficult-to-access sites may need manual labour or smaller equipment, increasing costs.
  • Waste disposal and recycling – Sustainable demolition with material recycling may reduce costs but requires careful planning.
  • Permit fees – Council approvals and permits can add to the total cost.

Every project is unique, and costs can vary based on specific site conditions and requirements. At DemoEx, we provide transparent, obligation-free quotes to help you plan your project with confidence.

Shellharbour

Frequently Asked Questions About Demolition And Excavation in Shellharbour

Before starting the project in Shellharbour, you may need approval from the local council and other regulatory bodies. The permits required depend on factors such as the project size, location, and environmental impact.

Development Approval (DA): In most cases, a Development Application (DA) is required from Shellharbour City Council before the project can begin. This ensures that the project meets zoning, heritage, and environmental regulations.

Some minor works may be exempt, but it’s best to check with the council.

Construction Certificate (CC): Once the DA is approved, a Construction Certificate (CC) may be needed. This confirms that the work complies with building regulations and approved plans before construction or site preparation begins.

Asbestos Removal Permit: If the structure contains asbestos, specific permits and procedures must be followed for safe removal. Licensed professionals must handle asbestos removal under SafeWork NSW guidelines.

Work, Health & Safety (WHS) Requirements: For larger projects, compliance with SafeWork NSW safety regulations is crucial. Depending on the scope, a Demolition Work Plan and Excavation Management Plan may be required.

Road or Footpath Occupation Permit: If the project affects public spaces, such as footpaths or roads, a permit from the local council is necessary to ensure public safety and minimal disruption.

Selecting the right contractor in Shellharbour is crucial for ensuring safety, efficiency, and compliance with regulations. Here are the key factors to consider when making your decision:

Check Licensing and Certifications: A reputable contractor should be fully licensed and insured to perform this kind of work in New South Wales. Ensure they hold the necessary qualifications, including a SafeWork NSW demolition licence and relevant excavation permits.

Experience and Expertise Matter: Look for a contractor with proven experience in handling projects similar to yours. Whether it’s residential, commercial, or industrial projects, an experienced team will have the skills to manage challenges like asbestos removal, underground utilities, and site preparation.

Compliance with Safety and Environmental Standards: Safety is a top priority. A professional contractor should follow Work Health and Safety (WHS) regulations, use proper protective equipment, and implement dust and noise control measures.

Transparent Quotes and Contracts: A trustworthy contractor will provide a detailed quote outlining the scope of work, timeline, and costs. Be wary of vague pricing or contractors who cannot provide a written agreement—transparency is key to avoiding unexpected expenses.

Reputation and Customer Reviews: Research the contractor’s reputation by checking online reviews, testimonials, and previous project portfolios. Recommendations from local clients can help gauge their reliability and quality of work.

Equipment and Technology: Modern methods require advanced machinery and techniques for precision and efficiency. Ensure the contractor has well-maintained equipment suited for your project’s scale and complexity.

Communication and Customer Service: A reputable contractor will provide clear communication, keep you updated throughout the project, and be responsive to any concerns. Good customer service reflects professionalism and commitment to client satisfaction.

The timeline in Shellharbour depends on factors like project size, site conditions, permit approvals, and weather conditions.

However, here’s a general guide to help you understand how long your project might take.

Residential Poject Timeline

  • Small structures (sheds, garages, fences): 1–3 days
  • Single-storey home demolition: 5–10 days
  • Double-storey home demolition: 7–14 days
  • Partial demolition (e.g., removing a wall or extension): 3–7 days
  • Asbestos removal (if needed): Can add 2–5 days depending on the amount

Commercial and Industrial Project Timeline

  • Small commercial buildings: 1–3 weeks
  • Large industrial sites: 4–8 weeks (varies based on structure size, hazardous materials, and complexity)

Excavation Timeline

  • Basic land clearing: 2–5 days
  • Foundation excavation for a new home: 1–2 weeks
  • Trenching for utilities (e.g., plumbing, electrical): 1–3 days
  • Rock excavation (if required): Can extend the project by 1–2 weeks

Factors That Can Affect the Timeline

  • Permit approvals – Council approvals can take a few weeks to a few months, so planning ahead is crucial.
  • Site conditions – Rocky terrain, tree roots, or underground utilities may slow down the project.
  • Weather – Heavy rain can delay the project and make the site unsafe for machinery.
  • Waste disposal and recycling – Sustainable methods (sorting and recycling materials) may take extra time.

Every project is different, and at DemoEx, we provide realistic timelines based on your specific needs. Our experienced team ensures an efficient and safe project, minimising delays and keeping your project on track.

Yes, asbestos removal in Shellharbour is strictly regulated to ensure safety and environmental compliance.

Asbestos can pose serious health risks if not handled correctly, and both SafeWork NSW and Shellharbour City Council have specific guidelines for its removal.

Licensing Requirements

  • Only licensed asbestos removalists can legally remove more than 10m² of bonded (non-friable) asbestos.
  • Friable asbestos (which crumbles easily and becomes airborne) must always be removed by a contractor with a Class A asbestos removal licence.

Pre-Demolition Asbestos Inspection

  • A Hazardous Materials Survey or Asbestos Inspection Report must be conducted by a licensed asbestos assessor.
  • If asbestos is found, a removal plan must be submitted and approved before the project begins.

Safe Removal and Disposal Procedures

  • Asbestos-containing materials must be carefully removed, wrapped in plastic, and sealed before transport.
  • Disposal must take place at an EPA-approved waste facility—it is illegal to dump asbestos in general waste or landfill.

Notification and Compliance

  • Contractors must notify SafeWork NSW at least 5 days before removing more than 10m² of asbestos.
  • Local councils may require additional permits for demolition involving asbestos.
  • Worksites must follow strict air monitoring and decontamination protocols to prevent asbestos fibres from spreading.

Fines and Penalties for Non-Compliance

  • Heavy fines apply for unsafe asbestos handling, illegal dumping, or failure to comply with regulations.
  • Property owners and contractors share responsibility for ensuring asbestos is managed correctly.